Central
clinic - Alejilat 1995.
Intensive care ward, men
surgery ward, and operation room at Eljimel hospital -
Eljimel 1995.
Dentist Clinic - Alejilat - 1993
Animals Clinic - Alejilat - 1994
Reconstruction of Farwah island beacon - Ras-Ejdeer -
2002.
-
Execution of Civil Activities:
In
western Libya, we have involved in the Millitah Gas
project to perform several civil works as listed below:
Task |
Qty |
Unit |
form work |
12455 |
m2 |
lean concrete |
867 |
m3 |
plane concrete |
750 |
m2 |
reinforced concrete |
7185 |
m3 |
steel insertion |
4824 |
kg |
steel wire mesh |
58573 |
kg |
bolts with different diameters |
47568 |
kg |
steel bars cutting, bending, and installing |
799906 |
kg |
paving 150 mm |
6667 |
m2 |
paving 200 mm |
2459 |
m2 |
paving 300 mm |
381 |
m2 |
bitumen paint |
4778 |
m2 |
water stoppers |
160 |
m |
sealing of joints |
7323 |
m |
polyethylene sheets insertion |
9878 |
m2 |
acid resistant bricks |
314 |
m2 |
filler material |
39596 |
dm3 |
painting |
1024 |
m2 |
Performed
more than 7268 meters; internal and external fencing
including 12 steel gates and some barriers in Millitah
Gas Project.
|
However, Millitah Gas project was quite big and had a
lot work to do, another part has assigned to us was
earth moving, specifications as bellow:
Task |
Qty |
Unit |
excavation in different types of soil |
134439 |
m3 |
compaction of soil |
104649 |
m2 |
backfilling of A2/3/4 soil |
142141 |
m3 |
backfilling of A1 soil |
16900 |
m3 |
dike work |
28996 |
m3 |
superficial trimming |
4041 |
m2 |
Supply of soil from local areas: |
A1 soil |
20329 |
m3 |
A2-4, A4
soil |
160045 |
m3 |
We made
some other cooperation in different tasks as
follows:
Tasks |
Hours |
different tasks |
24950 |
building and plastering |
4840 |
formworks |
2730 |
steel fixing works |
380 |
Finalizing slabs for Surman city training center -
Surman - 1992.
Finalizing external maintenance for the Social
Security Center - Alejilat - 1993
|